Acquisition of Chiller Equipment Supply
Inter-American Development Bank
Description
The qualification requirements include:
Financial capacity: The Bidder must demonstrate in each of the last five years (2015, 2016, 2017, 2018 and 2019) that it has had sales for an amount of at least 1.0 times the value of its proposal for this tender; for which you must provide documented evidence:
- For national bidders: Audited Financial Statements or the Financial Statements presented to SUNAT with their due proof of presentation and payment (PDT of the Sworn Declaration of payment of the Annual Income Tax for the fiscal years (2015, 2016, 2017, 2018 and 2019 ) or canceled invoices accompanied by their proof of compliance without having incurred a penalty in those years (2015, 2016, 2017, 2018 and 2019).
- For foreign bidders: Audited Financial Statements or Financial Statements presented to the competent tax authority of your country with their due proof or canceled invoices accompanied by their proof of compliance without having incurred a penalty in said years (2015, 2016, 2017, 2018 and 2019).
Experience and Technical Capacity: The Bidder must provide documented evidence that demonstrates its compliance with the following experience requirements:
- Have sold at least 100% of the accumulated value of your proposal in the last 05 years (2015, 2016, 2017, 2018 and 2019 or counted from the deadline for submission of offers).
Key Personnel: The Bidder must provide documented evidence that demonstrates its compliance with the following experience requirements.
- The professional personnel responsible for the installation must be: Mechanical engineer, electrical and / or electronic mechanic; collegiate and empowered by elCIP. Accredit a minimum experience of two (2) years in similar work involving the conditioning of equipment and / or air conditioning and / or refrigeration systems. The contractor must provide at least for the assembly of the equipment - 3 mechanical technicians - 2 weld technicians or approved welders - 1 electrical technician - 1 supervisor. Accredit a minimum experience of two (2) years in similar work involving the conditioning of equipment and / or air conditioning and / or refrigeration systems.
For more information visit the original publication.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1
