Acquisition of Specialized Software for Monitoring the Dam of the Francisco Morazán CHFM Hydroelectric Power Plant
Inter-American Development Bank
Description
The objectives of the consultancy are: (i) to improve the reliability and operational efficiency of the plant as an asset to increase ERV's participation in the National Interconnected System (SNI) and its integration with the System Operator (OdS); (ii) to have technical studies to evaluate the increase in its generation capacity; and (iii) to strengthen local capacity and operational units of the plant.
Below are listed the goods or services required:
- Acquisition of specialized software for monitoring the dam of the Francisco Morazán Hydroelectric Power Plant, including a license for a period of 3 years.
- Configuration, installation, and commissioning of the software according to the technical specifications.
- Training for involved personnel (approximately 15 people)
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Honduras
Consulting for sizing energy storage systems in the power system of Honduras
Management as FIDIC Engineer of the construction and equipment of the Traumatology Hospital of San Pedro Sula
Technical assistance services for the preparation and implementation of business plans and plans for forest cover and soil restoration
Acquisition of computer and communications equipment for the UCP and units of the Secretariat of Security