Acquisition of Technological Infrastructure for Special Economic Zones
Inter-American Development Bank
Description
The qualification requirements include:
- Financial capacity: The Bidder must demonstrate that in each of the last two years (2018 and 2019) have had sales for a minimum amount of US $ 2,535,000.00 (Two million five hundred and thirty-five thousand with 00/100 United States Dollars of North America); for which you must provide documented evidence: Financial Statements, which can be credited with the copy of the PDT of the Sworn Declaration of payment of the Annual Income Tax for the fiscal years 2018 and 2019 or canceled invoices, which will be accounted from the deadline for submitting offers two years ago.
- Experience and Technical Capacity Further details are provided in the Bidding Documents. The Bidder must provide documented evidence that demonstrates its compliance with the following experience requirements: Have sold at least US $ 1,689,564.00 (One million six hundred eighty-nine thousand five hundred and sixty-four with 00/100 United States Dollars), in the last 5 years (2015, 2016, 2017, 2018 and 2019 or counted from the deadline for submission of offers).
- The Bidder must provide documented evidence that demonstrates compliance with the technical specifications of the Goods offered in accordance with the provisions of the minimum technical requirements and other requirements required therein.
For more information visit the original publication.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1