BRT Economic Modeling and Evaluation in Montevideo
Opportunity details
Description
The Inter-American Development Bank (IDB) is seeking to hire a consulting firm to carry out the socioeconomic and technical evaluation of the Bus Rapid Transit (BRT) project in the city of Montevideo. The study aims to provide critical inputs for decision-making on the physical, operational and financial viability characteristics of this mass transit system.
Key points of this consultancy:
1. Demand and Scenario Modeling
The firm will have to adjust existing transport models to represent current and future mobility conditions in Montevideo. This includes:
Study area: A radius of approximately 30 km from the city center, covering the metropolitan area.
Time horizons: Estimation of demand for different periods of the project's useful life, considering competition with other modes of transport.
2. Economic evaluation and analysis of alternatives
Cost-Benefit: Estimation of socio-economic benefits (travel time savings, emission reduction, road safety) versus investment and operating costs.
Optimization: Identification of physical and operational alternatives to the preliminary design of the BRT to maximize its performance.
Complementary measures: Analysis of interventions in road infrastructure and traffic management that enhance the impact of the BRT corridor.
3. Technical recommendation and decision-making
The final product will be a data-backed technical recommendation that identifies the most convenient alternative to implement. The consultant may propose the collection of primary information (traffic surveys) if technically justified to reduce uncertainty in the simulation models.
Note: Interested companies should review the registration requirements on the BEO Bidder Portal.
More from Uruguay
Consultancy for the improvement of online procedures: interaction between competent professional and manager, and change of competent professional or owner
Public Works Contract for the Rehabilitation, Maintenance and Financing of the Road Infrastructure of Routes No. 13, 15 and 39 – Maintenance of Sustainable Assets
ID Salto – Urban and environmental improvement of the Saladero neighborhood
Third Corridor 500 kV Chamberlain - Cardal - Pando
More in Business
From Planning to Investment: A Guide to Developing Transport Project Portfolios in Latin America and the Caribbean
Specialized Technical Support for the Preparation and Delivery Management of the Goals and Actions Plan (PMA) 2028-2031
Regulation of Reckless Bidding in the bidding processes of concession projects.
Consulting firm for diagnosis of the EPS housing market and strategic roadmap