The Inter-American Development Bank (IDB) invites specialized consulting firms to submit their proposals to carry out a technical-environmental characterization and mapping of mining governance in the provinces of Salta, Catamarca and Jujuy, in the Lithium Region of Argentina.
The main objective is to evaluate regulatory instruments, permits, inspection processes, monitoring mechanisms, mine closure plans and post-mining transition schemes, as well as the articulation between mining and environmental authorities to identify concrete opportunities for institutional strengthening.
1. Technical scope and strategic axes
Permits and environmental management: Characterize the Environmental Impact Assessment (EIA) procedures, granting of permits, approval conditions and technical information requirements in each jurisdiction.
Monitoring and oversight: Evaluate the actual application of inspection systems, control of environmental commitments, information reporting, and contingency management.
Mine closure and post-mining transition: Analyze the regulatory and institutional criteria applied or under development for the closure phase and territorial environmental recovery.
Capacities and institutional interconnection: Identify operational bottlenecks, availability of information systems, and the level of coordination between mining, environmental, and other competent authorities.
2. Fieldwork and methodology
Qualitative and territorial survey: Design and carry out semi-structured interviews, work meetings and technical visits in the three provinces with representatives of the public sector, private sector, civil society, academia and local actors.
Systematization of information: Integrate primary and secondary data on administrative records, technical reports, available indicators, and inspection history.
Regional comparative analysis: Contrast the frameworks of Salta, Catamarca and Jujuy to identify provincial good practices, common patterns and operational gaps.
3. Expected deliverables
Deliverable 1 — Initial Report: Detailed work plan, provincial survey strategy, mapping of key actors and initial matrix of environmental instruments and practices.
Deliverable 2 — Progress Report (Provincial): Specific diagnosis for each province (Salta, Catamarca and Jujuy) on the operation of instruments, monitoring mechanisms, available capacities and local recommendations.
Deliverable 3 — Final Comparative Report: Regional comparative analysis that consolidates operational gaps, lessons learned and recommendations to strengthen oversight, information traceability, mine closure and post-mining transition in the Lithium Region.
Note: Interested companies should review the requirements on the BEO Bidder Portal.
More from Argentina
Development for the management of the registration of professionals and the qualification of health establishments
Construction of highway on Provincial Route No. 11, section: Mar de Ajó – Pinamar
Contracting for the renovation of WiFi network infrastructure of the Ministry of Infrastructure and Public Services of the Province of Buenos Aires
AA-Construction of basic works, drains and pavements in the access to the town of Fachinal by Provincial Route No. 205 – Province of Misiones
More in Project impact
Loss Mitigation Analytics and DSM Frameworks Consultancy
Review and revalidation of the priorities of the expansion works of the High Voltage Transmission System of Argentina
Strategic Feasibility Study and Investment Decision Support for the Special Purpose Park for Carnival and Festivals
Grid Code Modernisation and Regulatory Reform