Construction of the Pampas de Padilla Irrigation System
Inter-American Development Bank
Description
Construction of the Pampas de Padilla Irrigation System with a delivery / construction term of:
- LOT 2-a: 350 days, from the issuance of the Intiation Act (350 days until provisional reception plus 120 days until final reception) and intends to be simultaneous to the lot 2-b.
-LOT 2-b: 350 days, from the issuance of the Initiation Act (350 days until provisional reception plus 120 days until final reception) and has a referential price of Bs13,087,737.59 (thirteen million eighty-seven thousand seven hundred thirty-seven 59/100 Bolivianos) and Bs 25,132,729.27 (Twenty-five million one hundred thirty-two thousand seven hundred twenty-nine 27/100 Bolivianos).
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV