Construction of high voltage transmission lines
Inter-American Development Bank
Description
Construction services are required for the LD 138 kV Tubarao Sul RB High Voltage Transmission Lines - Sectioning (Jorge Lacerda - Orleans) (lot 01); LD 138 kV Itapema Meia Praia - Sectioning (Tijucas - Porto Belo C2) (lot 02); including the supply of equipment and materials needed for the works as described in the Technical Specifications, Engineering Projects, Plants and other related documents attached to the Bidding Documents.
For more information, access the original publication.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Brazil
Specialized Technical Support for the Preparation and Delivery Management of the Goals and Actions Plan (PMA) 2028-2031
Hiring of a specialized consulting company for the updating, elaboration and implementation of strategic planning and for the structuring, implementation and institutionalization of a risk management methodology of the SEFAZ-TO
Hiring of a consulting company to provide continuous training (Formadores en Acción)
Design of a model of care cooperatives for the provision of care services for the elderly to cooperative members in Paraná (Brazil), in collaboration with OCEPAR
