The Inter-American Development Bank (IDB) invites specialized consulting firms to submit proposals for the operational design, field execution and quality control of a survey of face-to-face surveys in Argentina (Project AR-L1410).
The objective is to collect primary data in vulnerable sectors (domestic workers or construction workers) to evaluate the impact of the public transport subsidy through a statistical methodology of differences in differences (DiD), within an execution period of 2 months.
1. Technical scope and methodological design
Probabilistic sampling and representativeness: Propose the maximum feasible number of face-to-face surveys according to the budget, defining margin of error, level of confidence and design effect.
Optimization of the instrument: Adapt the questionnaire provided to a maximum duration of 20 minutes to reduce abandonment, ensuring the capture of sociodemographic data, income, mobility patterns and transportation spending.
Incentives and operational flexibility: Design an incentive scheme (monetary or non-monetary) for respondents and structure logistics adaptable to different locations in the country according to the final assignment of treatment and control groups.
2. Key Activities and Quality Control
Training and pilot test: Train the team of enumerators and supervisors, executing a previous pilot to validate and adjust the collection tool.
Supervised fieldwork: Apply face-to-face surveys guaranteeing informed consent protocols, protection of personal data and direct supervision.
Data auditing (back-checks): Implement verification re-surveys on a subsample of applied questionnaires to certify the consistency of the information.
3. Expected deliverables
Output 1 — Work plan and protocol: Sample design, proposal for a maximum number of surveys, adapted questionnaire, incentive scheme and training plan.
Output 2 — Pilot test report: Pilot results and final instrument adjusted for mass deployment.
Output 3 — Database and field report: Cleaned database, variable dictionary, coverage report and back-check report.
Output 4 — Final methodological report: Consolidation of the process, lessons learned and strategic recommendations for subsequent evaluations.
Note: Interested companies should review the requirements on the BEO Bidder Portal.
Development and implementation of a traceability system applied to wood components for social housing, aimed at distributed manufacturing in SMEs
Supply, installation and commissioning of an access control system, video surveillance cameras and structured cabling for the administrative network of the New National Monitoring Center of the National Customs Authority
Design of a communication campaign, production and elaboration of communication products for the dissemination of the National Care Policy in Paraguay (PNCUPA)
Hiring a company to build UBSI - LPN 018/2026
Design, development and validation of an integrated social and health assessment system, which includes a dependency scale for the identification of the target population of the care policy
Equipment for the replacement of terminals with energy efficiency labelling
Expansion of the high-voltage electricity transmission system under the public works concession regime (Law 17,520) "AMBA I"
Prospective Geochemical Soil Survey in the Eastern Pegmatite Province of Brazil, State of Minas Gerais
Improvement and expansion of the wastewater treatment service in 5 production units in 4 districts of the provinces of Chanchamayo and Concepción, Junín
Feasibility study for the design of a mixed carbon pricing instrument in Peru (carbon tax, emissions trading system)
Support for the implementation of the Hospital Quality Program of Piauí - QUALIHPI