Consulting services are required to carry out case studies on the operation and risk management based on experiences in Asia
Inter-American Development Bank
Description
The consulting services (“the Services”) include
General information of the tunnel and procurement information as below, but not limited to:
- Summary of Tunnel: length, construction cost, construction period, construction method, cross section of tunnel, composition of lanes, features including vertical and horizontal slope, pavement method, clearance, traffic volume forecast and real, and other information needs for operation & risk management
- Procurement: Procurement procedure and duration, Evaluation method, Special conditions on Cost overrun and Construction delay.
Technical feature of facilities for routine operation & risk management, and organizational structure for operation and maintenance as below, but not limited to:
Facilities for routine operation & risk Management
- Facility lists: workers path, escape gate(path), ventilation, fire extinguish, communication, imagery sensing, snow melting system before & after tunnel, traffic control facility, traffic control room, and other information needs for operation & risk management;
- Features: installation space, capacity or specification, size, and other information needs for operation & risk management.
Organizational structure for operation & maintenance
Organizational structure chart, number of staffs, role of each staff;
Facility list for Operation and Maintenance such as vehicles;
Annual budget for Operation and Maintenance.
Performance criteria of operation & maintenance
- Performance criteria of routine maintenance including pavement, light, ventilation, signs, etc.
- Tunnel availability during the year except emergency.
Roles and responsibilities of agencies in case of emergency
- Roles and responsibilities of each agency in case of emergency among operation agency, police, fire fighter, hospital, etc.
- Emergency procedures in cases such of traffic accident and/or fire accidents, etc.
Recommendation on below components for Agua Negra Tunnel.
- On Facilities for Risk Management;
- On Organizational structure for Operation & Maintenance;
- On Role & Responsibility of each agency in case of Emergency;
The estimated timeframe for completion is 12 months.
For more information about this Business Opportunity, please consult the Original Publication issued by the contracting entity
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
