Consulting to redesign and apply a regulatory impact analysis (AIR) methodology that uses artificial intelligence for CRC
Opportunity details
Description
The Inter-American Development Bank (IDB) is convening consulting firms to strengthen the analytical and decision-making capacities of Colombia's Communications Regulatory Commission (CRC). The project focuses on the redesign of the Regulatory Impact Analysis (AIR) through the integration of artificial intelligence and advanced analytics, allowing a more efficient and evidence-based evaluation of public policies.
1. Diagnosis and design of the AIR model
- AS-IS analysis: Diagnosis of the current AIR process to identify operational, methodological and analytical gaps.
- Methodological design: Creation of a new AIR model that incorporates advanced analytics adapted to the regulatory context of communications.
- Data inventory: Survey and structuring of internal and external data sources needed to feed AI models.
2. Development of artificial intelligence tools
- Functional architecture: Design and development of analytical modules and AI functionalities that support the evaluation of regulatory alternatives.
- Dataset preparation: Cleaning and documentation of datasets to ensure the accuracy of the developed models.
- Technological integration: Creation of an operational AIR tool that unifies the technical methodology with the technological support.
3. Piloting and knowledge transfer
- Pilot application: Validation of the methodology in a real regulatory case prioritized by the CRC, evaluating alternatives based on the results of the AI.
- Institutional training: Transfer of technical capabilities to the CRC team to ensure autonomous operation and maintenance of the tool in the future.
Note: Interested companies should review the requirements on the BEO Bidder Portal.
More in Project impact
Loss Mitigation Analytics and DSM Frameworks Consultancy
Review and revalidation of the priorities of the expansion works of the High Voltage Transmission System of Argentina
Strategic Feasibility Study and Investment Decision Support for the Special Purpose Park for Carnival and Festivals
Grid Code Modernisation and Regulatory Reform