Contracting of functional recovery works of state highways (single lot)
Opportunity details
Description
The Federative Republic of Brazil has received financing from the Inter-American Development Bank (IDB) for the Productive Development Program of the Northeast Region - Prodepro. The objective is to apply these resources to improve the logistics infrastructure, facilitating the flow of production and regional economic development.
Banco do Nordeste do Brasil S.A. invites qualified companies to carry out works for the functional recovery of state highways under the Single Lot regime. The project focuses on the deep restoration of the pavement and drainage, with an estimated execution time of 18 months.
[Image: A road maintenance crew using heavy machinery to mill old asphalt and prepare the road base for new paving]
Engineering services include:
Paving and Restoration: Includes cold milling, application of CBUQ (Hot Machined Bituminous Concrete), deep patches, bonding paint and application of polyester geogrid for pavement reinforcement.
Earthworks: Execution of cuts, embankments, loans and regularization of the subgrade following the technical standards of DNIT.
Drainage and Structures: Installation of gutters, ditches, tubular and cellular concrete culverts, energy sinks and collection boxes.
Signaling and Safety: Implementation of horizontal (thermoasphalt by extrusion and sprinkler) and vertical signaling, in addition to the installation of metal fenders and sound.
Complementary Works: Construction of passenger shelters and protective fences.
[Image: A finished section of a highway with fresh asphalt, clear horizontal road markings, and installed metal safety barriers]
The bidding follows the International Public Bidder (LPI) procedures. As a requirement for participation, bidders must present an Offer Maintenance Guarantee in the amount of R$ 2,500,000.00. The technical specifications strictly follow DNIT standards and ABNT NBR standards.
Note: The bidding documents and technical standards mentioned are available in the official language of the country (Portuguese).
More from Brazil
Specialized Technical Support for the Preparation and Delivery Management of the Goals and Actions Plan (PMA) 2028-2031
Hiring of a specialized consulting company for the updating, elaboration and implementation of strategic planning and for the structuring, implementation and institutionalization of a risk management methodology of the SEFAZ-TO
Hiring of a consulting company to provide continuous training (Formadores en Acción)
Design of a model of care cooperatives for the provision of care services for the elderly to cooperative members in Paraná (Brazil), in collaboration with OCEPAR
More in Road construction
Construction of highway on Provincial Route No. 11, section: Mar de Ajó – Pinamar
Public Works Contract for the Rehabilitation, Maintenance and Financing of the Road Infrastructure of Routes No. 13, 15 and 39 – Maintenance of Sustainable Assets
AA-Construction of basic works, drains and pavements in the access to the town of Fachinal by Provincial Route No. 205 – Province of Misiones
Works G2 – SP-563 – Lot 01