The objectives of the consultancy are: (i) improvement of the management model and the human resources structure; (ii) increase of the interoperability capacities and the use of information and communication technologies; (iii) strengthening of simultaneous, performance and risk and corruption prevention auditing and control capabilities; and (iv) improvement of the infrastructure for control services.
Description of services:
The consulting services (“the Services”) for which the most qualified consulting firm will be invited to submit proposals include: the preparation of the design (technical file) and Construction with Fast Track of the Work, equipment and furniture of the Regional Control Management of Ancash, with the use of the BIM methodology, where will concentrate in a comprehensive and articulated manner all the processes associated with the services provided by the Regional Management of Ancash control.
For more information on the scope of services to be provided and key activities, click on the "Access the original publication" button where you will find the official tender announcement.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1