Engineering, Procurement, Construction & Installation, Commissioning and Turn-key Delivery of Solar PV Power Plants is Required in Guyana
Inter-American Development Bank
Description
Engineering, Procurement, Construction & Installation, Commissioning and Turn-key Delivery of Solar PV Power Plants is Required in Guyana. It includes Battery Energy Storage Systems for the Hinterland at Bartica and Lethem in two Lots.
Qualification requirements include (but are not limited to) NIS and GRA Compliances (for Bidders registered in Guyana), Valid Business and VAT Registration (where applicable), experience financial and technical capacity. Additional details are provided in the Bidding Documents. A complete set of Bidding Documents in English may be uplifted by interested bidders on the submission from the address:
Guyana Energy Agency
295 Quamina Street, South Cummingsburg
Georgetown, Guyana
For more information, contact the contracting entity.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
