Execution of Work: Expansion of the Drinking Water and Sewerage Services of the cities of Juliaca and San Miguel, in the Province of San Román, Puno Region, Republic of Peru (Stage IV)
Inter-American Development Bank
Description
The Republic of Peru, through the National Urban Sanitation Program (PNSU) of the Ministry of Housing, Construction and Sanitation (MVCS), has received financing from the Inter-American Development Bank (IDB) for the UCP-Juliaca Project, whose objective is to expand and improve drinking water and sewerage services in the cities of Juliaca and San Miguel. in the province of San Román, Puno region. Part of the funds from the IDB loan No. 5840/OC-PE will be used for the execution of Stage IV of this project, with a construction period of 1200 calendar days.
The bidding process will be conducted in accordance with the Policies for the Acquisition of Goods and Works financed by the IDB (GN-2349-15) and is open to bidders from all countries specified in these policies. Those interested may obtain additional information and consult the tender documents, which will be available in Spanish as of February 18, 2025, by written request to the Project Coordinating Unit-Juliaca.
A virtual briefing will be held on March 7, 2025 at 10:00 a.m. (Peruvian time)
To access the details and annexes of the tender, please visit the following link on BID For the Americas: https://bidfortheamericas.connectamericas.com/es/tenderDetail?id=2002
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1