Formulation of the Georeferenced Plan for Universal Access to Electricity in Peru
Inter-American Development Bank
Description
The IDB intends to contract consulting services to support the government of Peru in the formulation of a Georeferenced Plan for Universal Access to Electricity, as a basis for providing universal, sustainable, reliable, and affordable access by the year 2030.
Consulting services include:
- Preparation of a national geo-referenced rural electrification plan, optimized at the lowest cost, which identifies both the energy solutions to be implemented throughout the country, as well as the associated investments that allow universal access to energy to be achieved by 2030.
- Development of a georeferenced database in GIS format with relevant information for the development and monitoring of the plan.
- Proposal of the investment plan necessary to achieve the goal of universal access by 2030, which will be based on a sustainable financial framework during the implementation of the plan.
- Proposal for minimum technical specifications for projects resulting from the national electrification plan.
- Identification of initiatives to strengthen the operational and technical capacity in the short term for the institutions and key agents of the sector that are involved in the implementation of the plan.
- Identification and presentation of the risks and mitigation measures identified for the implementation of the national rural electrification plan.
The estimated term to carry out the services is seven (7) months and the value of the consultancy will be approximately US$200,000.
For more details, please click the "Access the original publication" button.
Important: Expressions of interest must be received using the IDB Portal for Bank-Executed Operations http://beo-procurement.iadb.org/home before January 23, 2023, 5:00 PM. (Washington DC time).
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1
