Macro Sanitation Infrastructure of La Romana: Design and construction of collector networks, pumping stations, impulsion lines, treatment plant and submarine outfall in La Romana, as well as operation for 18 months
Inter-American Development Bank
Description
The Government of the Dominican Republic has requested a loan from the Inter-American Development Bank (IDB) to finance the cost of the Universal Sanitation Program in Coastal and Tourist Cities II, and intends to use part of the proceeds of this loan to make the payments stipulated in the Contract for the Design, Construction and Operation of the Macro Sanitation Infrastructure Works of La Romana.
The National Institute of Drinking Water and Sewerage (INAPA) invites eligible contractors and firms to participate in the prequalification for the aforementioned works, which include design, construction and operation for 18 months. The prequalification will follow the Policies for the Acquisition of Works and Goods financed by the IDB (GN-2349-15).
For more information and acquisition of prequalification documents, INAPA should be contacted through the email: inapa.dppe@inapa.gob.do, with a copy to jose.martinez@inapa.gob.do and nicolas.grullon@inapa.gob.do.
To access the details and annexes of the tender, please visit the following link on BID For the Americas: https://bidfortheamericas.connectamericas.com/es/tenderDetail?id=1947
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Dominican Republic
Contracting logistics services to develop workshops and technical meetings at the national level
Implementation of two diploma courses: (1) Comprehensive Environmental Assessment for officials of the Ministry of the Environment and (2) Diploma in Formulation of Environmental Impact Studies (EsIA and DIA) for environmental service providers
Design, construction, commissioning and operation, for a period of twenty (20) years, of the comprehensive drinking water and sanitation system of Verón-Punta Cana
