RD-CHM-4 Road Improvement, Section: Tecpán Guatemala - Patzún
Inter-American Development Bank
Description
The improvement project that covers an approximate length of 10,684 kilometers will consist of adjusting the existing subgrade layer, the construction of the sub-base and base with crushed material, and then placing a layer of hot asphalt concrete with a tread width of 5.50 meters; the construction of “L” and / or trapezoidal ditches for longitudinal drainage where necessary, the placement of transverse pipes in the ditches and the replacement of a bridge. In addition, the works include environmental mitigation during the construction phase. The construction period is 24 months.
All offers must be accompanied by an Offer Guarantee in the amount of ninety thousand US dollars (US $ 90,000.00) or an equivalent amount in a freely convertible currency. Offers that arrive late will be rejected.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Guatemala
Acquisition of computer equipment for the Information Technology Directorate of the Ministry of Health and Social Security
Furniture and equipment of Tower III of the MP
Updated tender - Pre-investment studies for road improvement routes rd-bv-21 and rd-qui-24, section: Chitomax - Los Pajales - Beleju - Aldea la Cruz, Chicaman, Quiche