Installation of guard cable with optic fiber (opgw) in 500kv lines under the modality of work with tension
Inter-American Development Bank
Description
The general objective is to contribute to guaranteeing the Salto Grande Hydroelectric Complex (CHSG) availability, providing reliability and efficiency to the interconnection between Argentina and Uruguay. The specific objective is to contribute to extending the useful life of the CHSG, by modernizing its infrastructure and equipment.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Argentina
Development for the management of the registration of professionals and the qualification of health establishments
Construction of highway on Provincial Route No. 11, section: Mar de Ajó – Pinamar
Contracting for the renovation of WiFi network infrastructure of the Ministry of Infrastructure and Public Services of the Province of Buenos Aires
AA-Construction of basic works, drains and pavements in the access to the town of Fachinal by Provincial Route No. 205 – Province of Misiones