Perform the audit of the Project Structuring Rosters
Inter-American Development Bank
Description
Component 3: Strengthening of technical capacities of local and regional actors for the structuring and implementation of subprojects.
This component will include three lines of action: (i) generation of technical capacities in project structuring; (ii) structuring of productive projects; and (iii) development of complementary technical studies for projects in Components 1 and 2.
This consultancy is part of Component 3, and its purpose is to supervise the Structuring Rosters of the projects that will carry out this process from the profiles that were eligible and prioritized by the Evaluation Rosters and were validated by the Operational Technical Committee and ratified by the Steering Committee in the SOUTH ZONE. The cycle of calls will be carried out in four stages: Stage 1. Call for project profiles and review of minimum requirements, Stage 2. Evaluation of project profiles; Stage 3. Project Structuring and Stage 4. Project financing and execution.
For more information visit the original publication.
More from Inter-American Development Bank
Construction of complementary works to the Calderas dam (Tarija)
REQUEST FOR INFORMATION (RFI) - Consulting services for the design and implementation of strategic planning methodologies and annual risk-based control plan for the Office of the Comptroller General of the State
REQUEST FOR INFORMATION (RFI) - Market survey for the design, construction, furniture and basic equipment of Civic Centers for Life and Peace (CCVP) – PREVIC
Consultancy to Conduct Evaluation of the Zones of Special Operations in Jamaica
