Montevideo Sanitation Program - Stage VI (PSU VI) IDB Loan 5410/OC-UR
Opportunity details
Description
The Municipality of Montevideo, through its Sanitation Executing Unit, has launched an International Public Bidding process with financing from the Inter-American Development Bank (IDB), under Loan Agreement 5410/OC-UR. The objective is to contract works for the implementation of Urban Sustainable Drainage Systems (SUDS), as part of the sixth stage of the Montevideo Sanitation Program.
The project aims to promote an innovative and sustainable approach to urban water management through infrastructure designed to capture, infiltrate, and control stormwater runoff, replicating the natural behavior of the hydrological cycle. The works include the construction of 65 rain gardens, a bioretention system, permeable pavement, and a flow attenuation structure in a stream, along with complementary works.
Given the geographical distribution of the interventions, the works will be carried out simultaneously across multiple sites, organized in phases with mobile construction units. The selected contractor must submit specific execution protocols for each site to ensure efficient and well-coordinated implementation. The contract duration is 12 months and is open to eligible firms and consortia from IDB member countries. The bidding documents are available on the official website of the Municipality.
To access the full bidding details and annexes, please visit the following link on BID For the Americas: https://bidfortheamericas.connectamericas.com/es/tenderDetail?id=2145
More from Uruguay
Consultancy for the improvement of online procedures: interaction between competent professional and manager, and change of competent professional or owner
Public Works Contract for the Rehabilitation, Maintenance and Financing of the Road Infrastructure of Routes No. 13, 15 and 39 – Maintenance of Sustainable Assets
ID Salto – Urban and environmental improvement of the Saladero neighborhood
Third Corridor 500 kV Chamberlain - Cardal - Pando