Design and construction of the project: "expansion and improvement of the Pampahasi potable water treatment plant"
Inter-American Development Bank
Description
The purpose of this announcement is to inform potential interested parties, the PRE-PICKUP (DDL Draft) and receive information, comments, observations, recommendations; which will be analyzed and revised in order to determine the final Bidding Document for the call to be carried out for the DESIGN AND CONSTRUCTION OF THE PROJECT: "EXPANSION AND IMPROVEMENT OF PAMPAHASI DRINKING WATER TREATMENT PLANT".
For which, the following activities are presented:
|
Object |
Place |
Date |
|
PRESENTATION OF THE CONCEPTUAL ENGINEERING OF THE PROJECT |
La Paz, Bolivia Offices of the Ministry of Environment and Water Zona Obrajes, Av. 14 de Septiembre Corner Calle 8, Edif. Ministry of Environment and Water, Ground Floor |
May 06, 2019 10:00 (local time) |
|
VISIT TO THE PLACE OF IMPLEMENTATION OF THE PROJECT |
La Paz, Bolivia Av. Ciudad del Niño corner Said S / N, Zona Alto Pampahasi Place of concentration: Offices of the Ministry of Environment and Water Contact Person: Ing. Andrés Acosta Phone: 591-22148233 int. 202. Cel.70179152 |
May 06, 2019 15:00 (local time) |
|
MEETING OF CONSULTATIONS |
La Paz, Bolivia Offices of the Ministry of Environment and Water Zona Obrajes, Av. 14 de Septiembre Corner Calle 8, Edif. Ministry of Environment and Water, Ground Floor |
May 07, 2019 10:00 (local time) |
|
RECEIPT OF INFORMATION, COMMENTS, OBSERVATIONS, RECOMMENDATIONS TO THE PRE-SHEET
(which may be sent in physical document or via email) |
La Paz, Bolivia Zona Obrajes, Av. 14 de Septiembre Corner Calle 8, Edif. Ministry of Environment and Water, Floor 6. Pilot Phone 591- 2-2148233, int. 206 |
Deadline: May 20, 2019 |
Information to be provided: The internet link to download the documents, can be requested at the email address indicated at the end of this notice, as of April 15, 2019.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV