The Inter-American Development Bank (IDB) is looking to hire a consulting firm to support Paraguay in the generation of a new alternative fuel (Waste-Derived Fuel - CDR). The project aims to replace current industrial biomass with a solid fuel from urban pruning waste (UPR), under a circular economy logic that strengthens resilience to climate change.
1. Strategic objectives and energy recovery
The consultancy focuses on the technological and operational validation of self-sustainable management systems:
Conversion to RDF: Test and secure the technology needed to transform pruning waste into an energy-efficient opportunity.
Operational optimisation: Evaluate the drying curves required for the RDF and ensure the functionality of the logistics centre (CELBIO).
Waste management: Improve the separation of urban solid waste at source and reduce the accumulation of unmanaged pruning in the metropolitan area of Asunción.
2. Social acceptability and inter-institutional collaboration
A critical component is to ensure that the system is adopted by all actors in the chain:
Formal and informal generators: Achieve the consensus and participation of municipalities, ANDE contractors and "carriteros" (social economy sector).
Industrial consumers: Ensure that the RDF produced meets the standards required by industries that currently consume traditional biomass.
Training: Develop knowledge transfer programs and operational manuals for technical personnel and collectors.
3. Scope of services and sustainability
The consulting firm must carry out a multidisciplinary analysis to guarantee the viability of the prototype:
Legal and financial analysis: Evaluate national and international regulations and design strategies that ensure long-term operational profitability.
Action plan: Develop a detailed implementation strategy with timelines, budgets, and environmental impact monitoring mechanisms.
Public consultation: Facilitate workshops with local authorities and representatives of the bioenergy industry to incorporate suggestions into the final design of the system.
Note: Interested companies should review the requirements for previous experience in biomass management and waste prototypes on the BEO Bidder Portal.
More from Paraguay
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
USF Dental Equipment - 1st Stage
Design, supply and installation for the rehabilitation and electromechanical modernization of the Acaray-Yguazú Hydroelectric Complex - Generation Train
More in Project impact
Loss Mitigation Analytics and DSM Frameworks Consultancy
Review and revalidation of the priorities of the expansion works of the High Voltage Transmission System of Argentina
Strategic Feasibility Study and Investment Decision Support for the Special Purpose Park for Carnival and Festivals
Grid Code Modernisation and Regulatory Reform