Road management, improvement and maintenance by service levels of road corridor no. 34B
Opportunity details
Description
Peru, through the Ministry of Transport and Communications (Provias Descentralizado), has financing from the Inter-American Development Bank (IDB) for the "Road Infrastructure Program For Regional Competitiveness (Proregion 2)" program. This call for International Public Bidding (IPL) invites eligible bidders to submit closed bids for the optimization of the national road network.
Scope of the works
Main objective: Execution of road management, improvement and maintenance services by service levels of road corridor No. 34 Sector B.
Execution period: The estimated time for the integral development of the works and their subsequent maintenance is 1828 days.
Qualification Requirements and Conditions
International Guidelines: The process is governed by the Policies for the Acquisition of Works and Goods financed by the IDB, being open to participants from all eligible countries of origin.
Evaluation criteria: The minimum conditions of technical, legal and financial capacity are detailed and complemented within Section III of the Bidding Documents (DDL).
Required guarantee: All proposals submitted by interested parties must include the Bid Maintenance Statement document.
Management and submission of bids
Access to the rules: Interested firms can request the complete set of bidding documents in Spanish by sending a written request to the official emails of Provias Descentralizado or by downloading them directly from the official SEACE web portal.
Delivery modality: Technical and economic bids must be submitted physically and in a sealed envelope at the entity's Headquarters in Lima. Electronic bids will not be allowed and late submissions will be rejected. The public opening of the envelopes will allow representatives to attend in person or via online connection.
Note: Consultation documents and supplementary specifications are available in the official language of the country.
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1
More in Road construction
Construction of highway on Provincial Route No. 11, section: Mar de Ajó – Pinamar
Public Works Contract for the Rehabilitation, Maintenance and Financing of the Road Infrastructure of Routes No. 13, 15 and 39 – Maintenance of Sustainable Assets
AA-Construction of basic works, drains and pavements in the access to the town of Fachinal by Provincial Route No. 205 – Province of Misiones
Works G2 – SP-563 – Lot 01