Consulting services are required to design the Ecuador - Peru electrical interconnection system.

The services include:

  • Substation Chorrillos Substation (Ecuador);
  • Transmission Line 500 kV Chorrillos - Pasaje (Ecuador);
  • Transmission Line 500 kV Passage - Frontier (Ecuador);
  • Substation Passage 500/230 kV;
  • Sectioning of the La Unión - San Idelfonso Mines Transmission Line at 230kV.