Se solicitan servicios para obra de mejoramiento y ampliación en las Regiones de Amazonas, Ayacucho, Cajamarca, Junín, Loreto, Piura, Puno, San Martin y Ucayali
Inter-American Development Bank
Description
In the framework of the Contract indicated, PIASAR invites eligible bidders to submit sealed bids for the execution of these water and basic sanitation works, providing a Basic Sanitation Unit (UBS) to each dwelling in the towns located in locations in the Region. PIURA, according to the following:
|
LOTE UNICO |
Provincia |
Distrito |
Localidad |
Plazo de Ejecución días calendarios |
|
Morropon |
De la Matanza |
Pampa de los Silva |
180
|
The objective of this project is the execution of the Work: INSTALLATION OF THE SERVICES OF DRINKING WATER AND BASIC SANITATION OF THE LOCALITY PAMPA DE LOS SILVA, DISTRICT OF THE MATANZA, PROVINCE OF MORROPON, DEPARTMENT OF PIURA. The execution of the Project is based on the need of the inhabitants to have a coverage of basic services that help to achieve acceptable living conditions and to fight Gastrointestinal diseases that usually occur in a high percentage, especially in the child population.
Eligible bidders who are interested can obtain additional information by writing to piasar@vivienda.gob.pe or by visiting our website http://pnsr.vivienda.gob.pe/portal/convocatorias-3/ They can also obtain a complete set of the Bidding Documents at the address indicated at the end of the notice, from 9:00 a.m. to 1:00 p.m. and 2:00 p.m. to 5:00 p.m., after sending a written request.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1