Solid Waste Management Program
Inter-American Development Bank
Description
The consulting services include the execution of 6 environmental centers in the South of the Argentine territory that, together with specific norms or ordinances to be planned, can provide the different localities with an adequate final disposal site for their urban solid waste. Once the study is completed, there must be a consolidated Final Report that includes and develops all the activities carried out throughout the study.
For more information visit the original publication.
More from Inter-American Development Bank
Construction of complementary works to the Calderas dam (Tarija)
REQUEST FOR INFORMATION (RFI) - Consulting services for the design and implementation of strategic planning methodologies and annual risk-based control plan for the Office of the Comptroller General of the State
REQUEST FOR INFORMATION (RFI) - Market survey for the design, construction, furniture and basic equipment of Civic Centers for Life and Peace (CCVP) – PREVIC
Consultancy to Conduct Evaluation of the Zones of Special Operations in Jamaica
More from Argentina
Development for the management of the registration of professionals and the qualification of health establishments
Construction of highway on Provincial Route No. 11, section: Mar de Ajó – Pinamar
Contracting for the renovation of WiFi network infrastructure of the Ministry of Infrastructure and Public Services of the Province of Buenos Aires
AA-Construction of basic works, drains and pavements in the access to the town of Fachinal by Provincial Route No. 205 – Province of Misiones
