Study about remaining service life, fatigue and wear analysis, improvement options and risk analysis of the large jump hydroelectric complex turbines
Inter-American Development Bank
Description
The consultancy will comprise: analysis of historical operation and maintenance data, plans, design and material data used, precision surveys on site, CFD and finite element modeling, on-site measurements for model validation, economic and risk analysis cosidered. Consider the information that Salto Grande will provide in reference to SG roll in the Argentine and Uruguayan electricity market, including future operating prospects and an different renewal options analysis. All the reports and inspections previously carried out should be considered, considering that the objective of this study is not to repeat them but to go one step further by applying new techniques.
For more information visit the original publication.
More from Inter-American Development Bank
Implementation of an e-learning learning management system for the National Digital Talent Platform
Expansion of the Right Bank ltaipú and Villa Hayes Substations in 500 kV
Consulting for sizing energy storage systems in the power system of Honduras
Expansion of the Itaipu and Villa Hayes Right Bank substations by 500 kV
More from Uruguay
Consultancy for the improvement of online procedures: interaction between competent professional and manager, and change of competent professional or owner
Public Works Contract for the Rehabilitation, Maintenance and Financing of the Road Infrastructure of Routes No. 13, 15 and 39 – Maintenance of Sustainable Assets
ID Salto – Urban and environmental improvement of the Saladero neighborhood
Third Corridor 500 kV Chamberlain - Cardal - Pando
