Study of the necessary workforce for the value chain
Inter-American Development Bank
Description
The sectors considered for the project are the following:
1 Agri-food
2 Construction
3 Industrial Maintenance
4 Tourism
For more information visit the original publication.
More from Inter-American Development Bank
Construction of complementary works to the Calderas dam (Tarija)
REQUEST FOR INFORMATION (RFI) - Consulting services for the design and implementation of strategic planning methodologies and annual risk-based control plan for the Office of the Comptroller General of the State
REQUEST FOR INFORMATION (RFI) - Market survey for the design, construction, furniture and basic equipment of Civic Centers for Life and Peace (CCVP) – PREVIC
Consultancy to Conduct Evaluation of the Zones of Special Operations in Jamaica
More from Peru
Implementation of an e-learning learning management system for the National Digital Talent Platform
Methodology for the evaluation of the curricular design of the EESP. Action 4.1
Methodology for the design and management of ESP optimisation plans – Action 3.1
Design and construction of the integral drinking water and sewerage system of Zarumilla and Aguas Verdes – Stage 03, Section 3.1
